[1]
Lozano-Galant, J.A. et al. 2014. Modifications of the Stress-State of Cable-Stayed Bridges due to Staggered Construction of their Superstructure. The Baltic Journal of Road and Bridge Engineering. 9, 4 (Dec. 2014), 241–250. DOI:https://doi.org/10.3846/bjrbe.2014.30.