[1]
Lozano-Galant, J.A. et al. 2015. Effects in Service of the Staggered Construction of Cable-Stayed Bridges Built on Temporary Supports. The Baltic Journal of Road and Bridge Engineering. 10, 3 (Sep. 2015), 247–254. DOI:https://doi.org/10.3846/bjrbe.2015.31.