AKINRADEWO, Opeoluwa; AIGBAVBOA, Clinton; OKE, Ayodeji; COFFIE, Harrison; OGUNBAYO, Babatunde. Unearthing Causative Factors of Cost Overrun on Ghanaian Road Projects. The Baltic Journal of Road and Bridge Engineering, Riga, Latvia, v. 17, n. 4, p. 171–188, 2022. DOI: 10.7250/bjrbe.2022-17.584. Disponível em: https://bjrbe-journals.rtu.lv/bjrbe/article/view/bjrbe.2022-17.584.. Acesso em: 3 may. 2024.