Unearthing Causative Factors of Cost Overrun on Ghanaian Road Projects

Authors

  • Opeoluwa Akinradewo cidb Centre for Excellence & Sustainable Human Settlement and Construction Research Centre, Faculty of Engineering and the Built Environment, University of Johannesburg, Johannesburg, South Africa https://orcid.org/0000-0002-4462-0960
  • Clinton Aigbavboa cidb Centre for Excellence & Sustainable Human Settlement and Construction Research Centre, Faculty of Engineering and the Built Environment, University of Johannesburg, Johannesburg, South Africa https://orcid.org/0000-0003-2866-3706
  • Ayodeji Oke cidb Centre for Excellence & Sustainable Human Settlement and Construction Research Centre, Faculty of Engineering and the Built Environment, University of Johannesburg, Johannesburg, South Africa https://orcid.org/0000-0001-6551-8634
  • Harrison Coffie cidb Centre for Excellence & Sustainable Human Settlement and Construction Research Centre, Faculty of Engineering and the Built Environment, University of Johannesburg, Johannesburg, South Africa https://orcid.org/0000-0002-2178-3978
  • Babatunde Ogunbayo cidb Centre for Excellence & Sustainable Human Settlement and Construction Research Centre, Faculty of Engineering and the Built Environment, University of Johannesburg, Johannesburg, South Africa https://orcid.org/0000-0002-4334-9136

DOI:

https://doi.org/10.7250/bjrbe.2022-17.584

Keywords:

construction industry, construction projects, cost overrun, Ghana, project cost, road projects

Abstract

When determining the success of a road project, cost is one of the most important variables to consider. This is because cost is the project’s backbone and driving force throughout the construction process. As a result, to assess the cost performance of a road project, the actual cost is compared to the planned cost. This research aims at uncovering the causal variables that contribute to cost overruns on road projects using Accra, Ghana as a case study. Relevant literature was thoroughly reviewed to extract identified factors. This study adopted a quantitative research approach, using a questionnaire developed to collect data from the target audience. The questionnaire survey was conducted using civil engineers and quantity surveyors working in the Ghanaian construction sector. The data that were retrieved were analysed using descriptive statistics and exploratory factor analysis. According to the findings, the main reasons driving cost overruns on road projects include consultant/ contractor-related, environment-related, economy-related, risk/uncertainty-related, technical-related, owner/client-related, and other project-related factors. It was determined that cost overruns in construction projects occurred because of a lack of professionalism on the part of the stakeholders engaged in the construction process from start to finish. Future research may therefore be conducted utilising all of Ghana’s regions to obtain a broad view of the research.

References

Abdullah, M. S., Alaloul, W. S., Liew, M.S., & Mohammed, B. S. (2018). Delays and cost overruns causes during construction of palm oil refinery projects. MATEC Web of Conferences, 203, Article 02004. https://doi.org/10.1051/matecconf/201820302004

Acharya, N. K., Lee, Y. D., Kim, S. Y., Lee, J. C., & Kim, C. S. (2006). Analysis of construction delay factor: A Korean perspective. In: 7th Asia Pacific Industrial Engineering and Management Systems Conference, 883–895.

Affleck, R. T., & Freeman, R. (2010). Challenges for engineering design, construction, and maintenance of infrastructure in Afghanistan (ERDC/CRREL SR-10-2). Engineer Research and Development Center, Hanover, NH Cold Regions Research and Engineering Lab.

Aibinu, A. A. A., & Jagboro, G. O. G. (2002). The effects of construction delays on project delivery in Nigerian construction industry. International Journal of Project Management, 20(8), 593–599. https://doi.org/10.1016/S0263-7863(02)00028-5

Al-Khaldi, Z. (1990). Factors affecting the accuracy of construction costs estimating in Saudi Arabia [Master Thesis, King Fahd University of Petroleum & Minerals], Saudi Arabia. https://core.ac.uk/download/pdf/146512569.pdf

Ali, A. S., & Kamaruzzaman, S. N. (2010). Cost performance for building construction projects in Klang valley. Journal of Building Performance, 1(1), 110–118. https://www.researchgate.net/publication/267968294_Cost_performance_for_building_construction_projects_in_Klang_valley

Amoatey, C. T., & Ankrah, A. N. O. (2017). Exploring critical road project delay factors in Ghana. Journal of Facilities Management, 15(2), 110–127. https://doi.org/10.1108/JFM-09-2016-0036

Apolot, R. (2011). Investigation of the causes of delay and cost overrun in construction projects in Uganda’s public sector [Master thesis, Makerere University].

El Asmar, M., Hanna, A. S., & Whited, G. C. (2011). New approach to developing conceptual cost estimates for highway projects. Journal of Construction Engineering and Management, 137(11), 942–949. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000355

Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large building construction projects. International Journal of Project Management, 24(4), 349–357. https://doi.org/10.1016/j.ijproman.2005.11.010

Auditor General Sweden. (1994). Infrastrukturinvesteringar: En kostnadsjämörelse mellan plan og utyfall i 15 storre prosjekt innöm Vägverket og. Stockholm.

Azhar, N., Farooqui, R. U., & Ahmed, S. M. (2008). Cost overrun factors in construction industry of Pakistan. First International Conference on Construction In Developing Countries (ICCIDC–I) “Advancing and Integrating Construction Education, Research & Practice”, 4–5. https://www.academia.edu/29783031/Cost_Overrun_Factors_In_Construction_Industry_of_Pakistan

Bagaya, O., & Song, J. (2016). Empirical study of factors influencing schedule delays of public construction projects in Burkina Faso. Journal of Management in Engineering, 32(5), Article 05016014. https://doi.org/10.1061/(asce)me.1943-5479.0000443

Eliasson, J., & Fosgerau, M. (2013). Cost overruns and demand shortfalls – Deception or selection? Transportation Research Part B: Methodological, 57, 105–113. https://doi.org/10.1016/j.trb.2013.09.005

Elinwa, A. U., & Silas, A. B. (1993). Construction cost factors in Nigeria. Journal of Construction Engineering and Management, 119(4), 698–713. https://doi.org/10.1061/(ASCE)0733-9364(1993)119:4(698)

Ellis, R., Pyeon, J., Herbsman, Z., Minchin, E., & Molenaar, K. (2007). Evaluation of alternative contracting techniques on FDOT construction projects (Final report). University of Florida. https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/research/reports/fdot-bdc51-rpt.pdf

Enshassi, A., & Ayyash, A. (2014). Factors affecting cost contingency in the construction industry – Contractors’ perspective. International Journal of Construction Management, 14(3), 1–25. https://doi.org/10.1080/15623599.2014.922729

Faridi, A. S., & El‐Sayegh, S. M. (2006). Significant factors causing delay in the UAE construction industry. Construction Management and Economics, 24(11), 1167–1176. https://doi.org/10.1080/01446190600827033

Flyvbjerg, B. (2007). Cost overruns and demand shortfalls in urban rail and other infrastructure. Transportation Planning and Technology, 30(1), 9–30. https://doi.org/10.1080/03081060701207938

Flyvbjerg, B., Glenting, C., & Ronnest, A. (2004). Procedures for dealing with optimism Bias in transport planning. London: The British Department for Transport, Guidance Document. https://ssrn.com/abstract=2278346

Flyvbjerg, B., Holm, M. K. S., & Buhl, S. L. (2004). What causes cost overrun in transport infrastructure projects? Transport Reviews, 24(1), 3–18. https://doi.org/10.1080/0144164032000080494a

Fouracre, P., Allport, R., & Thomson, J. (1990). The performance and impact of rail mass transit in developing countries. Transport and Road Research Laboratory, Wokingham, Berkshire, UK.

Fragkakis, N., Marinelli, M., & Lambropoulos, S. (2015). Preliminary cost estimate model for culverts. Procedia Engineering, 123, 153–161. https://doi.org/10.1016/j.proeng.2015.10.072

Frimpong, Y., Oluwoye, J., Crawford, L., Yaw, F., Jacob, O., & Lynn, C. (2003). Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study. International Journal of Project Management, 21(5), 321–326. https://doi.org/10.1016/S0263-7863(02)00055-8

Ibironke, O. T., Oladinrin, T. O., Adeniyi, O., & Eboreime, I. V. (2013). Analysis of non-excusable delay factors affecting contractors’ performance in Lagos, Nigeria. Journal of Construction in Developing Countries, 18(1), 53–72. https://core.ac.uk/download/pdf/199244816.pdf

Kaliba, C., Muya, M., & Mumba, K. (2009). Cost escalation and schedule delays in road construction projects in Zambia. International Journal of Project Management, 27(5), 522–531. https://doi.org/10.1016/j.ijproman.2008.07.003

Kasimu, M. A. (2012). Significant factors that causes cost overruns in building construction project in Nigeria. Interdisciplinary Journal of Contemporary Research in Business, 3(11), 775–780.

Lee, J.-K. (2008). Cost overrun and cause in Korean social overhead capital projects: roads, rails, airports, and ports. Journal of Urban Planning and Development, 134(2), 59–62. https://doi.org/10.1061/(ASCE)0733-9488(2008)134:2(59)

Long, L.-H., Lee, Y. D., & Lee, J. Y. (2008). Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries. KSCE Journal of Civil Engineering, 12(6), 367–377. https://doi.org/10.1007/s12205-008-0367-7

Love, P. E. D., & Ahiaga-Dagbui, D. D. (2018). Debunking fake news in a post-truth era: The plausible untruths of cost underestimation in transport infrastructure projects. Transportation Research Part A: Policy and Practice, 113, 357–368. https://doi.org/10.1016/j.tra.2018.04.019

Love, P. E. D., Wang, X., Sing, C., & Tiong, R. L. K. (2013). Determining the probability of cost overruns in Australian construction and engineering projects. Journal of Construction Engineering and Management, 139(3), 321–330. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000575

Love, P. E. D, Sing, C.-P., Carey, B., & Kim, J. T. (2015). Estimating construction contingency: Accommodating the potential for cost overruns in road construction projects. Journal of Infrastructure Systems, 21(2), 1–10. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000221

Molenaar, K. R. (2005). Programmatic cost risk analysis for highway megaprojects. Journal of Construction Engineering and Management, 131(3). https://doi.org/10.1061/(ASCE)0733-9364(2005)131:3(343)

Nasir, A. R., Gabriel, H. F., & Choudhry, R. M. (2011). Cost and time overruns in highway projects in Pakistan. Sixth International Conference on Construction in the 21st Century (CITC-VI) “Construction Challenges in the New Decade”, Kuala Lumpur, Malaysia, 69–76.

Nega, F. (2008). Causes and effects of cost overrun on public building construction projects in Ethiopia [Master thesis, Addis Ababa University], Ethiopia. http://etd.aau.edu.et/handle/123456789/1246

Nulty, D. D. (2008). The adequacy of response rates to online and paper surveys: what can be done? Assessment & Evaluation in Higher Education, 33(3), 301–314. https://doi.org/10.1080/02602930701293231

Odeck, J. (2004). Cost overruns in road construction – what are their sizesand determinants? Transport Policy, 11(1), 43–53. https://doi.org/10.1016/S0967-070X(03)00017-9

Olawale, Y. A., & Sun, M. (2010). Cost and time control of construction projects: inhibiting factors and mitigating measures in practice. Construction Management and Economics, 28(5), 509–526. https://doi.org/10.1080/01446191003674519

Omoregie, A., & Radford, D. (2006). Infrastructure delays and cost escalation: Causes and effects in Nigeria. Proceedings of the 6th International Postgraduate Research Conference in the Built and Human Environment, International Council for Research and Innovation in Building and Construction, 45–55.

Pallant, J. (2011). SPSS survival manual: A step by step guide to data analysis using IBM SPSS. Routledge, London, UK.

Park, Y. I., & Papadopoulou, T. C. (2012). Causes of cost overruns in transport infrastructure projects in Asia: Their significance and relationship with project size. Built Environment Project and Asset Management, 2(2), 195–216. https://doi.org/10.1108/20441241211280873

Polat, G., & Duzcan, M. (2010). Factors affecting cost contingency in international projects. PM-05 – Advancing Project Management for the 21st Century, Heraklion, Crete, Greece, 29–31. https://www.irbnet.de/daten/iconda/CIB18327.pdf

Roachanakanan, K. (2005). A case study of cost overruns in a Thai condominium project [Doctoral dissertation, Texas A&M University]. https://core.ac.uk/download/pdf/147124044.pdf

Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5), 517–526. https://doi.org/10.1016/j.ijproman.2006.11.007

Singh, R. (2009). Delays and cost overruns in infrastructure projects – An enquiry into extents, causes and remedies. Economic and Political Weekly, 45(21), 43–54. http://re.indiaenvironmentportal.org.in/files/Delays%20and%20Cost%20Overruns%20in%20Infrastructure.pdf

Smith, G. R., & Bohn, C. M. (1999). Small to medium contractor contingency and assumption of risk. Journal of Construction Engineering and Management, 125(2), 101–108. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:2(101)

Swei, O., Gregory, J., & Kirchain, R. (2017). Construction cost estimation: A parametric approach for better estimates of expected cost and variation. Transportation Research Part B: Methodological, 101, 295–305. https://doi.org/10.1016/j.trb.2017.04.013

Tavakol, M., & Dennick, R. (2011). Making sense of Cronbach’s alpha. International Journal of Medical Education, 2, 53–55. https://doi.org/10.5116/ijme.4dfb.8dfd

Vidalis, S. M., & Najafi, F. T. (2002). Cost and time overruns in highway construction. Canadian Society for Civil Engineering – 30th Annual Conference: 2002 Chellenges Ahead, 2799–2808.

Zafar, I., Yousaf, T., & Ahmed, D. S. (2016). Evaluation of risk factors causing cost overrun in road projects in terrorism affected areas Pakistan – a case study. KSCE Journal of Civil Engineering, 20(5), 1613–1620. https://doi.org/10.1007/s12205-015-0348-6

Downloads

Published

23.12.2022

How to Cite

Akinradewo, O., Aigbavboa, C., Oke, A., Coffie, H., & Ogunbayo, B. (2022). Unearthing Causative Factors of Cost Overrun on Ghanaian Road Projects. The Baltic Journal of Road and Bridge Engineering, 17(4), 171-188. https://doi.org/10.7250/bjrbe.2022-17.584