Modifications of the Stress-State of Cable-Stayed Bridges due to Staggered Construction of their Superstructure

Authors

  • Jose Antonio Lozano-Galant Dept of Civil Engineering, Universidad de Castilla-La Mancha, Avda, Camilo José Cela, s/n, 13071 Ciudad Real, Spain
  • Lidia Ruiz-Ripoll Dept of Civil Engineering, Universidad de Castilla-La Mancha, Avda, Camilo José Cela, s/n, 13071 Ciudad Real, Spain
  • Ignacio Payá-Zaforteza ICITECH, Dept of Construction Engineering, Universitat Politècnica de Valencia, Camino de Vera s/n, 46022 Valencia, Spain
  • José Turmo Dept of Construction Engineering, Universitat Politècnica de Catalunya, BarcelonaTech, c/ Jordi Girona 1-3, C1, 08034 Barcelona, Spain

DOI:

https://doi.org/10.3846/bjrbe.2014.30

Keywords:

cable-stayed bridge, erection, stay force, simulation, construction process, tensioning process

Abstract

In current practice, the effects of the evolutionary erection of cable-stayed bridge superstructure are rarely included into the simulation of its tensioning process. In fact, stay forces in service are usually defined in early stages of design, when the construction process has not even been conceived in detail yet. In order to fill this gap, the effects of the evolutionary erection of cable-stayed bridge superstructure throughout the tensioning process are studied in this paper. This study is focused on steel cable-stayed bridges erected on temporary supports. For the very first time a new criterion to include the effects of the evolutionary erection of cable-stayed bridges into the definition of the stay forces in the service state is presented.

References

Aboul-Ella, F. 1990. New Iterative Analysis of Cable-Stayed Structures, Computers & Structures 40(3): 549‒554. http://dx.doi.org/10.1016/0045-7949(91)90225-B

Bywalski, C.; Kaminski, M. 2013. Rheological Strains in Concrete Modified with Steel Fibre Reinforcement, Journal of Civil Engineering and Management 19(5): 656‒664. http://dx.doi.org/10.3846/13923730.2013.803497

Du, G. H. 1989. Optimal Cable Tension and Construction Tensioning of Cable-Stayed Bridges, Bridge Construction 11‒17. (in Chinese).

Hegab, H. 1987. Energy Analysis of Double-Plane Cable-Stayed Bridges, Journal of Structural Engineering 113(10): 2174‒2188. http://dx.doi.org/10.1061/(ASCE)0733-9445(1987)113:10(2174)

Hegab, H. 1986. Energy Analysis of Cable-Stayed Bridges, Journal of Structural Engineering 112(5): 1182‒1195. http://dx.doi.org/10.1061/(ASCE)0733-9445(1986)112:5(1182)

Kim, T. H.; Kim Y. J.; Shin, H. M. 2014. Performance Assessment of Precast Concrete Pier Cap System, Computers and Concrete 13(4): 501‒516. http://dx.doi.org/10.12989/cac.2014.13.4.501

Lazar, B. E.; Troitsky, M. S.; Douglas, M. C. 1972. Load Analysis Balancing of Cable Stayed Bridges, Structural Division ASCE 92(8): 1725‒1740.

Li, L. G.; John, Z. G.; Oesterle, R. G. 2010. Improved Longitudinal Joint Details in Decked Bulb Tees for Accelerated Bridge Construction: Fatigue Evaluation, Journal of Bridge Engineering 15(5): 511‒522. http://dx.doi.org/10.1061/(ASCE)BE.1943-5592.0000097

Lin, Y. C. 2014. Construction 3D BIM-Based Knowledge Management System: a Case Study, Journal of Civil Engineering and Management 20(2): 186‒200. http://dx.doi.org/10.3846/13923730.2013.801887

Lozano-Galant, J. A.; Turmo, J. 2014a. Creep and Shrinkage Effects in Service Stresses of Concrete Cable-Stayed Bridges, Computers and Concrete 13(4): 483‒499. http://dx.doi.org/10.12989/cac.2014.13.4.483

Lozano-Galant, J. A.; Turmo, J. 2014b. An Algorithm for Simulation of Concrete Cable-Stayed Bridges Built on Temporary Supports and Considering Time Dependent Effects, Engineering Structures 79: 341–353. http://dx.doi.org/10.1016/j.engstruct.2014.08.018

Lozano-Galant, J. A.; Dong, X.; Payá-Zaforteza, I.; Turmo, J. 2013. Direct Simulation of the Tensioning Process of Cable-Stayed Bridges, Computers and Structures 121: 64‒75. http://dx.doi.org/10.1016/j.compstruc.2013.03.010

Lozano-Galant, J. A.; Payá-Zaforteza, I.; Dong. X.; Turmo, J. 2012a. Analysis of the Construction Process of Cable-Stayed Bridges Built on Temporary Supports, Engineering Structures 40: 95−106. http://dx.doi.org/10.1016/j.engstruct.2012.02.005

Lozano-Galant, J. A.; Payá-Zaforteza, I.; Dong, X.; Turmo, J. 2012b. New Algorithm to Model the Construction Process of Cable-Stayed Bridges Built on Temporary Supports, Engineering Structures 40: 119‒130. http://dx.doi.org/10.1016/j.engstruct.2012.02.022

Navratil, J.; Zich, M. 2013. Long-Term Deflections of Cantilever-Segmental Bridges, The Baltic Journal of the Road and Bridge Engineering 8(3): 190‒195. http://dx.doi.org/10.3846/bjrbe.2013.24

Veletzos, M. J.; Restrepo, J. I. 2011. Modeling of Jointed Connections in Segmental Bridges, Journal of Bridge Engineering 16(1): 139‒147. http://dx.doi.org/10.1061/(ASCE)BE.1943-5592.0000112

Wang, P. H.; Tang, T.; Zheng, H. 2004. Analysis of Cable-Stayed Bridges during Construction by Cantilever Method, Computers & Structures 82(4‒5): 329‒346. http://dx.doi.org/10.1016/j.compstruc.2003.11.003

Wong, J. C. K.; Lee, Y. Y.; Lo, Y. T.; Wong, K. W.; Lueng, A. Y. T.; Fok, W. K.; Lam, H. F.; Wong, C. K.; Yie, C. Y. E. 2014. The Correlation between the Noise and Vibration Induced by a Bridge Movement Joint, The Baltic Journal of the Road and Bridge Engineering 9(3): 208‒214. http://dx.doi.org/10.3846/bjrbe.2014.26