Quality Attributes and Complex Assessment Methodology of the Asphalt Mixing Plant
DOI:
https://doi.org/10.3846/1822-427X.2008.3.161-166Keywords:
asphalt mixing plant (AMP), hot mix asphalt (HMA), quality, attribute, assessment, additiveAbstract
Multi-attribute methods in road construction can be used on the national, organization and project levels. However, most assessment methods are seeking to find how to make the most economic construction decisions, and most of all these decisions are intended only for economic objectives. Computerised Asphalt Mixing Plants (AMP) are one of the most expensive and complicated equipments for construction of road pavements. Modern AMP is controlling by computer program, but there are still some problems. Properties of the AMP not always satisfy demands and requirements of road constructors. Quality of the asphalt hot mixtures, environmental contamination, pollution, firm economic well-being and possibility to satisfy demands of hot asphalt mixture users depend on the AMP quality. This paper proposes a multi-attribute model for efficient quality assessment of the AMP. For this problem were selected 9 main quality attributes and weighted by expert ranking method. The problem is solved by applying additive assessment. Also, a case study is presented.
References
Antuchevičienė, J.; Turskis, Z.; Zavadskas, E. K. 2006. Modeling renewal of construction objects applying methods of the game theory, Technological and Economic Development of Economy 12(4): 263–268.
Asphalt Institute. 2007. The asphalt handbook. Manual series No. 4 (MS-4). 7th edition. Lexington: Asphalt Inst. 607 p. ISBN 0318400499.
Čygas, D.; Laurinavičius, A.; Vaitkus, A.; Perveneckas, Z.; Motiejūnas, A. 2008. Research of asphalt pavement structures on Lithuanian roads (I), The Baltic Journal of Road and Bridge Engineering 3(2): 77–83.
Jones, L. 1986. Recent developments in coating plant technology, Quarry Management 23(10): 25–30.
Kaklauskas, A.; Zavadskas, E. K.; Banaitis, A.; Šatkauskas, G. 2007. Defining the utility and market value of real estate a multiple criteria approach, International Journal of Strategic Property Management 11(2): 107–120.
Petkevičius, K.; Sivilevičius, H. 2008. Necessary measures for ensuring the required quality of hot mix asphalt in Lithuania and their practical implementation, The Baltic Journal of Road and Bridge Engineering 3(1): 29–37.
Petkevičius, K.; Christauskas, J. 2006. Asphalt concrete quality assurance during production, The Baltic Journal of Road and Bridge Engineering 1(3): 151–155.
Radziszewski, P. 2007. Modified asphalt mixtures resistance to permanent deformations, Journal of Civil Engineering and Management 13(4): 307–315.
Roberts, F. L.; Mohammad, L. N.; Wang, L. B. 2002. History of hot mix asphalt mixture design in the United States, Journal of Materials and Civil Engineering 14(4): 279–294.
Sivilevičius, H. 2003. Influence of homogeneity of mineral materials grading and dosing errors on the stability of asphalt concrete mixture composition, Journal of Civil Engineering and Management 9(1): 25–35.
Sivilevičius, H. 2005. The analysis of the new asphalt concrete mixing plant batchers and their smart control systems, in Proc of the 6th International Conference “Environmental Engineering”: selected papers, vol. 2. Ed. by Čygas, D.; Froeh-ner, K. D. May 26–27, 2005, Vilnius, Lithuania. Vilnius: Technika, 775–782.
Sivilevičius, H.; Šukevičius, Š. 2007. Dynamics of vehicle loads on the asphalt pavement of European roads which cross Lithuania, The Baltic Journal of Road and Bridge Engineering 2(4): 147–154.
Sivilevičius, H.; Vislavičius, K. 2008. Stochastic simulation of the influence of variation of mineral material grading and dose weight on the homogeneity of hot-mix asphalt, Construction and Building Materials 22(9): 2007–2014.
Su, Ch.-W.; Cheng, M.-Y.; Lin, F.-B. 2006. Simulation-enhanced approach for ranking major transport projects, Journal of Civil Engineering and Management 12(4): 285–291.
Viteikienė, M.; Zavadskas, E. K. 2007. Evaluating the sustainability of Vilnius city residential areas, Journal of Civil Engineering and Management 13(2): 149–155.
Zavadskas, E. K.; Antuchevičienė, J. 2007. Multiple criteria evaluation of rural building’s regeneration alternatives, Building and Environment 42(1): 436–451.
Zavadskas, E. K.; Kaklauskas, A. 2007. Mehrzielselection für Entscheidungen im Bauwesen [Multiple objective selection of decisions in civil engineering]. Fraunhofer IRB Verlag. 276 p. ISBN 9783816772033.
Zavadskas, E. K.; Kaklauskas, A.; Peldschus, F.; Turskis, Z. 2007. Multi-attribute assessment of road design solutions by using the COPRAS method, The Baltic Journal of Road and Bridge Engineering 2(4): 195–203.
Zavadskas, E. K.; Turskis, Z. 2008. A new logarithmic normalization method in Games theory, Informatica 19(2): 303–314.
Zhang, J. 1996. Keys to success in drum mix plant market in Southern States, CMJ news, Fall: 18–23.
Ziari, H.; Khabiri, M. M. 2007. Interface condition influence on prediction of flexible pavement life, Journal of Civil Engineering and Management 13(1): 71–76.
Downloads
Published
Issue
Section
License
Copyright (c) 2008 Vilnius Gediminas Technical University (VGTU) Press Technika
This work is licensed under a Creative Commons Attribution 4.0 International License.